As an independent greenhouse design company, Aegis Greenhouse Systems is paid to get your project right — not to sell a structure. Our consulting covers technical design, engineering review and investment planning, giving investors and growers an objective basis for a capital decision.

Engineers reviewing greenhouse layout drawings and specification documents on site
Engagement
Independent of suppliers
Feasibility study
3 – 6 weeks
Deliverables
Design + cost model
Typical savings
8 – 15% of CAPEX

01

Consulting process

A structured process that moves from open question to bankable decision in defined stages.

  1. Discovery and brief

    We collect location, target crop, planned area, market channel, water and power availability, budget range and timeline, then agree the commercial objective the greenhouse must serve.

  2. Technical and climate analysis

    Historical climate data, water analysis, soil and topography, structural load requirements and local regulations are analysed to establish the real engineering envelope.

  3. Concept design and options

    Two or three viable configurations are developed with different technology levels, each with layout, specification outline and indicative budget so trade-offs are explicit.

  4. Detailed specification

    The selected concept becomes a tender-ready technical specification: structure, climate systems, growing system, irrigation, controls and interface requirements.

  5. Decision support

    Cost model, yield assumptions, sensitivity analysis and phasing options are presented in a format suitable for boards, lenders and grant applications.

02

Engineering support

Technical depth applied to the decisions that carry the most cost and risk.

Design review and audit

Existing drawings and supplier proposals are checked for load compliance, ventilation adequacy, screening logic, drainage and missing scope.

Climate strategy engineering

Heating and cooling capacity, vent area, screen selection, humidity management and CO₂ dosing modelled against local climate extremes.

Water and fertigation engineering

Source water analysis, treatment selection, storage sizing, dosing accuracy, recirculation and drain water strategy.

Structural verification

Wind and snow load assumptions, gutter height, span and column grid verified against the applicable national code.

Supplier qualification

Manufacturing capability, certification, reference project verification and factory audit support before commitment.

Operational readiness

Labour model, agronomy routines, monitoring protocols, spare parts strategy and training plan defined before commissioning.

03

Investment planning

Greenhouse investment is a long-horizon asset decision. We model it as one.

CAPEX modelling

Structure, climate, growing system, irrigation, controls, civil works, logistics, duties and installation built into one delivered-and-installed figure.

OPEX and yield model

Energy, labour, substrate, seed, nutrients, packaging and maintenance modelled against realistic yield curves for the crop and technology level.

Payback and sensitivity

Payback and margin tested against price volatility, yield shortfall, energy cost movement and currency exposure.

Phased expansion strategy

Phase-one scale chosen so infrastructure is sized for the end state while capital exposure stays proportional to proven performance.

04

Typical consulting deliverables

  • Feasibility study with go / no-go recommendation
  • Climate analysis report and design criteria
  • Concept layouts with expansion phasing
  • Tender-ready technical specification and equipment list
  • CAPEX and OPEX financial model
  • Supplier long list, scoring matrix and audit notes
  • Risk register with mitigation actions
  • Implementation roadmap and project schedule

FAQ

Consulting questions

Common technical and commercial questions about greenhouse design company.

What does a greenhouse design company actually do?

A greenhouse design company translates a crop and business objective into an engineered facility: climate-driven design criteria, structural specification, climate and irrigation system sizing, layout planning and equipment definition. Aegis performs this work independently of manufacturers, so the design follows the project requirement rather than an available product line.

Why hire an independent consultant instead of relying on the manufacturer?

A manufacturer optimises for the products it makes. An independent consultant compares structures, climate strategies and growing systems across the market, verifies the specification against your climate and crop, and represents your interests during bid comparison, inspection and commissioning.

How much does greenhouse consulting cost?

Feasibility and design engagements are usually scoped as a fixed fee based on project area and technology level, while project management is typically a percentage of CAPEX or a monthly retainer. On most commercial projects the fee is recovered through better specification and tendering alone.

Can you review a greenhouse quotation we already received?

Yes. Quotation and specification review is one of our most requested services. We check load ratings, ventilation area, glazing, screening, climate capacity, growing system compatibility, exclusions and payment terms, then return a written risk and gap report with recommended clarifications.

Start Your Greenhouse Project

Send your location, target crop and planned growing area. You will receive a technical response with a suitable greenhouse configuration and an indicative budget range.

Independent greenhouse solution provider · Response within one business day