Should treatment be included before the first project budget is approved?
Include an allowance when available or pending source-water information could change raw-water storage, filtration, drainage, controls or supplier boundaries. The allowance protects the budget from scope volatility; final equipment selection still requires verified water analysis and peak irrigation-flow design.
Which findings can materially change greenhouse treatment scope?
EC, bicarbonate alkalinity, sodium, iron, suspended solids and microbial exposure can each affect the required duty of an EC/pH automatic dosing controller, filtration train, blending evaluation or sanitation interface. Their significance depends on the crop programme, source reliability, recirculation plan and confirmed hydraulic demand rather than one universal threshold.
How much raw-water storage should a commercial greenhouse allow for?
A preliminary allowance of 1–3 days of irrigation demand is a Reference Baseline where source continuity is uncertain. Final storage volume should be confirmed against daily demand, peak irrigation timing, refill rate and separate fire-water requirements where applicable.
When should reverse osmosis be evaluated for greenhouse irrigation water?
Reverse osmosis should be evaluated when dissolved salts or specific ions may restrict crop fit or leave insufficient nutrient-recipe headroom, and blending cannot provide a workable alternative. Its 0.5–2.0 MPa class high-pressure duty and concentrate-routing boundary require supplier confirmation from verified feed-water data.
Does water treatment affect fertigation cost and control?
Yes. Source-water chemistry can change acid demand, nutrient-recipe flexibility and the integration requirements of an EC/pH automatic dosing controller. A 4 L/h drip-emitter concept also requires solids control, but it does not set a final 80–130 micron filtration specification; emitter passage dimensions and raw-water loading govern that decision.
What should suppliers include in a treatment scope?
Suppliers should declare the inlet-water basis, peak irrigation flow, storage volume, filtration duty, treatment duty, controls interface, electrical load, backwash-water demand, drainage or concentrate-routing assumptions, commissioning, consumables, service intervals and exclusions. Comparable offers need the same design basis, not simply similar equipment names.